Priority Schools Building Programme

Renewal of state primary and secondary schools across the UK, funded and administered by the EFA

Gleeds were tasked with providing whole life value models to prove that the Kier Construction approach to design and delivery would provide long term benefits, as well as reduced capital costs. 

Using an analysis of alternative technologies, Gleeds were able to advise on the most appropriate long term design solutions, optimising the efficiency of the schools.

Gleeds tailored the standard whole life value report to draw comparisons between the Kier Construction adopted design solutions, compared to traditional school design solutions. This was then used to demonstrate enhancements and the long term cost benefits achieved. 