Logistic and office building
Building type is AR Sortable 650OB. Fulfilment warehouse includes 64 loading bays, located inbound and outbound in the ground floor. The L1- L2 is equipped by MHE and other L3 -L4 equipped with robotics devices and workstations on the perimeter.
During project execution, the modification was requested by the client to cancel VNA and extend the floor level in L3-L4 in this area. Modification extended Robotic Storage zone in L3 and L4 and relocated the receiving platform outside from warehouse.